?>
روانشناسی      اخبار اقتصادی      ابجد      -      گلی شی      دانلود فیلم دوبله فارسی      نوید      ویپ چی      روز ۱۰۰      هفت ستاره      روز 100      سینما برتر      -      -      قیمت روز      بلوک سبک      -      قرص تاخیری      آموزش تعمیرات موبایل      *      +      -      *      +      استخر پیش ساخته      تراست ولت      ردیاب موتور      *      صرافی تتر      بروکر فارکس      +      خرید کتاب تاپ ناچ      +      *      تحلیل اتریوم      -      فیلم هندی      *      -      -      .      +      -      +      -      /      حواله وسترن یونیون      کربنات کلسیم      خرید ماینر      -      دکتر زنان مشهد      خرید لایسنس نود 32      کسب درآمد      خرید رپورتاژ      فروش آنتی ویروس      سیگنال فارکس      لایسنس رایگان نود 32      یوزر پسورد نود 32      سئو سایت      لایسنس نود32      آپدیت نود 32      بهترین بک لینک     
A Spark Occurred In The Electric Installations  South africa plugs South africa plugs .

South africa plugs

A Spark Occurred In The Electric Installations

In addition to this, the electrical cable and wiring was covered with lofty plywood.“The report has recommended that no NOC (no objection certificate) for occupation should be provided till the concerned developer and occupiers take adequate measures to ensure fire safety,” said a senior fire official.

Mumbai Fire Brigade’s (MFB) report has ascertained defective electric circuit as the cause of the fire in Crystal Tower, in which four people were killed. The lift lobby area was also covered with interior decorative European extension cords combustible material and hence was entirely gutted. The building, with no occupation certificate (OC), was illegal and its fire fighting system of the building was also not found to be in working condition. The fire erupted due to a spark occurred in the electric installations, which came in contact with combustible materials nearby, said the report.The report was prepared after going through statements of eyewitnesses and observations made as well as circumstantial evidences, said fire officials.

According to the report prepared by the MFB, electrical cables laid down from the shaft along the wall were not sealed at each floor level and hence fire rapidly spread through the shaft.There were also wooden framed shoe racks on every floor that played a major role in generating more heat and spreading the fire rapidly on the 12th and 13th floors of the building.Four people including an elderly woman were killed and 21 were injured in a major fire that broke out in the Crystal Tower, a residential high-rise building at Hindmata, Parel, on August 22.


برچسب: EuroPlugs Manufacturers، SAA extension lead Factory، China Power boards Suppliers،
امتیاز:
 
بازدید:
+ نوشته شده: ۱۸ بهمن ۱۳۹۹ساعت: ۰۹:۴۸:۰۴ توسط:wittensize موضوع:

ارسال نظر
نام :
ایمیل :
سایت :
آواتار :
پیام :
خصوصی :
کد امنیتی :